Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Issue Section
Date
Availability
1-4 of 4
Keywords: Temporary
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1996) 117 (2): 106–108.
Published: 01 May 1996
...B DIMBYLOW; D O NEILL; J M PEARSON © Thomas Telford and ICE 1996 BALFOUR MAUNSELL DERBYSHIRE CONSULTING AIRPORTS WATER SURFACE POLLUTION CONTROL DEICING DEICANTS STORAGE TEMPORARY PUMPS PUMPING DISPOSAL RIVERS CONSTRUCTION MEASURES REMEDIAL AIRCRAFT CHEMICALS...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1993) 100 (4): 213–225.
Published: 01 November 1993
...W. H. Boyle, MBE, BA, BAI, MICE, FIHT This Paper describes the construction of the River Avon bridges and, in particular, the temporary works adopted to span the River Avon at the two crossing points. © Thomas Telford and ICE 1993 R M Douglas Construction Bridges Motorways M40...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1993) 100 (3): 145–156.
Published: 01 August 1993
...N. J. Beaney, BSc, MICE; J. M. Martin, BSc, MICE This Paper explains the construction phase of the project. It contains an introduction followed by a detailed description of the temporary works, and the construction methods and equipment used. A detailed discussion is provided on the factors...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1992) 95 (4): 239–242.
Published: 01 November 1992
... revealed the need to support the lining in two locations. Rock bolting, grouting and guniting was used at one weak area whereas at the east end a tunnel-within-a-tunnel was constructed for 120 m using precast concrete segments. Extensive temporary works and careful monitoring of the tunnel structure...
