Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Issue Section
Date
Availability
1-6 of 6
Keywords: Value
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1999) 135 (4): 185–194.
Published: 01 November 1999
... schemes do not incorporate a monetary value to the loss of landscape caused by a new road. The contingent valuation method (CVM) oers the opportunity to derive a value equal to the preservation bene®ts of alternative schemes which do not adversely aect the landscape. This study identi®es the values...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1997) 123 (1): 17–29.
Published: 01 February 1997
...J OLIPHANT; M G WINTER © Thomas Telford and ICE 1997 HERIOT WATT UNIVERSITY TRANSPORT RESEARCH LABORATORY TRL MOISTURE CONDITIONS APPARATUS USE LIMITS MCA FORMULATION MCV VALUE CALIBRATION LINES TESTS LABORATORIES PARTICLES SIZE PROJECTS ROADS EARTHWORKS MATERIALS...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1996) 117 (1): 70.
Published: 01 February 1996
... the specifications: it large tubular steel struts closely spaceMd.r had got tobe real value engineering!On the Back said that that temporary propping was Limehouse Link there was a committeeof three designed to withstand the increased wall people, one eachfrom the client, the consulting loading associated...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1994) 105 (4): 273–281.
Published: 01 November 1994
... for the road was available from Durham County Council (DCC) and, together with typical axle loads from the Traffic Loading Unit, University of Newcastle upon Tyne, the study estimated actual exponent values for sections of public road assuming that a power law relationship existed between structural wear...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1994) 105 (3): 153–164.
Published: 01 August 1994
... CONTRACTORS VALUE ENGINEERING DELAYS COMPLETION COOPERATION TOP DOWN TENDERS COFFERDAMS BOTTOM UP COSTS REDUCTION ENVIRONMENT NOISE VIBRATIONS CONTROL ACCESS CONSTRAINTS DIAPHRAGM WALLING WALLS DEWATERING WELLS CONCRETE GROUNDWATER ROOFS SLABS FINISHES SERVICES COORDINATION...
Journal Articles
Proceedings of the Institution of Civil Engineers - Transport (1992) 95 (1): 51–59.
Published: 01 February 1992
... NPV NET Present Value PVF Edinburgh Scotland UK The developmentof transport strategies for Edinburgh A . D.May, BA, MICE, MIHT, FCIT,M . Roberts, BSc, MSc, MICE, and P. Mason, MSc, FICE Proc. Instn Civ. Engrs Tramp., 1992, 95, Feb., 51-59 Paper 9865 In 1990 a consortiumof...
