Quantitative comparisons of different reservoir operation schemes can provide valuable suggestions for decision making and help to promote new planning tools under changing environments. The full spectrum of reservoir operation schemes (rule-curve-based setup (RBS), single-objective optimisation setup (SOS), bi-objective optimisation setup (BOS) and many-objective optimisation setup (MOS)) was considered in this work. A large reservoir in the southwest of China (Qinshitan reservoir) was used as a case study. The four reservoir operation schemes were established using similar formulations and were evaluated quantitatively under typical hydrological years. For the considered optimisation problem, progressive improvement on the solution was obtained from RBS to SOS, then BOS and finally MOS. Among the models, the MOS provided a comprehensive perspective on reservoir operation and achieved the best performance in terms of offering the most options for decision making. The MOS also discovered a step-wise operational scheme that had not been captured by the RBS, the SOS or the BOS.
Article navigation
June 2024
Research Article|
April 07 2023
Evaluation of reservoir operation schemes: from rule curve to many-objective optimisation
Duan Chen;
Duan Chen
Department Head, Changjiang River Scientific Research Institute, Wuhan, China; Hubei Key Laboratory of Water Resources & Eco-Environmental Sciences, Wuhan, China; Key Laboratory of River Regulation and Flood Control in the Middle and Lower Reaches of the Yangtze River of Ministry of Water Resources, Wuhan, China (corresponding author: chenduan@mail.crsri.cn)
Search for other works by this author on:
Arturo Leon;
Arturo Leon
Associate Professor, Department of Civil and Environmental Engineering, Florida International University, Miami, FL, USA
Search for other works by this author on:
Ruonan Li;
Ruonan Li
Senior Research Fellow, Research Center for Eco-environmental Sciences, Chinese Academy of Sciences, Beijing, China
Search for other works by this author on:
Rui Han
Rui Han
Professor, State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin, China Institute of Water Resources and Hydropower Research, Beijing, China
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
April 09 2021
Accepted:
February 16 2023
Online ISSN: 1751-7729
Print ISSN: 1741-7589
Emerald Publishing Limited: All rights reserved
2023
Proceedings of the Institution of Civil Engineers - Water Management (2024) 177 (3): 160–172.
Article history
Received:
April 09 2021
Accepted:
February 16 2023
Citation
Chen D, Leon A, Li R, Han R (2024), "Evaluation of reservoir operation schemes: from rule curve to many-objective optimisation". Proceedings of the Institution of Civil Engineers - Water Management, Vol. 177 No. 3 pp. 160–172, doi: https://doi.org/10.1680/jwama.21.00022a
Download citation file:
1,151
Views
New and popular articles
Suggested Reading
Spare parts inventory management: a new hybrid approach
The International Journal of Logistics Management (November,2020)
Selection methods and diversity preservation in many-objective evolutionary algorithms
Data Technologies and Applications (August,2018)
Multi-objective design optimisation of steel framed structures using three different methods
International Journal of Structural Integrity (November,2021)
Research on parking characteristics and layout optimisation in expressway service areas
Infrastructure Asset Management (June,2025)
Hydraulic conditioning to manage potable water discolouration
Proceedings of the Institution of Civil Engineers - Water Management (October,2017)
Related Chapters
Simulating Rainwater Harvesting System Performance for a Campus University in Malaysia
Water Management and Sustainability in Asia
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.