Skip to Main Content
Keywords: dams
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers - Water Management 1–13.
Published: 19 May 2026
... implemented in the area, their application has been site-specific, lacking systematic, technology-specific spatial frameworks. In this study, a geographic information system integrated with multi-criteria decision making was used for developing separate, context-calibrated suitability models for dams, check...
Journal Articles
Proceedings of the Institution of Civil Engineers - Water Management (2025) 178 (3): 157–170.
Published: 21 January 2025
...Meirong Zhou, PhD; Junqiang Xia, PhD; Shanshan Deng, PhD Since operation of the Three Gorges dam, the mid-channel bars (MCBs) in the Middle Yangtze River (MYR) have experienced significant deformation, thus crucially affecting the stability of the river regime. However, systematic understanding...
Journal Articles
Proceedings of the Institution of Civil Engineers - Water Management (2012) 165 (1): 21–29.
Published: 01 January 2012
... eliminated from Equation 5. 03 5 2011 17 9 2010 ICE Publishing: All rights reserved 2012 barrages and reservoirs dams river engineering The following symbols are used in this paper. B width of tailwater bw width of jet...
Journal Articles
Proceedings of the Institution of Civil Engineers - Water Management (2005) 158 (1): 35–38.
Published: 01 March 2005
..., depending on a prepared computer program, is presented. 27 07 2004 05 11 2004 © 2005 Thomas Telford Ltd 2005 Water flows through a dam via a spillway. When the flow is released over the spillway structure, the potential energy is converted into kinetic energy at the toe of spillway...
Journal Articles
Proceedings of the Institution of Civil Engineers - Water Management (2004) 157 (1): 13–20.
Published: 01 March 2004
...A. Macdonald; S. D. R. Harwood; P. R. Vaughan This paper describes the work undertaken at Ladybower Reservoir to upgrade the dam to meet anticipated flood and freeboard standards until the year 2050. It describes the assessment undertaken on the original dam, the design of the new works...

or Create an Account

Close Modal
Close Modal