The study looked at the performance of a three-level composting tower, each level of which could take around 200 t of shredded mixed municipal solid waste. The composting material moved sequentially down through the three floors, taking 8–10 days to complete the cycle, targeting an Animal By-Products Regulations (ABPR) compliance regime of 70°C for 1 h. Using a 16 mm trommel screen, the yield of compost-like output (CLO) was typically 25–30% of the input by weight. The post-composting separation plant was found to be very effective in giving a range of other products for recycling. An energy usage estimate for the tower alone (not including shredding or post-compost separation) showed consumption between 25 and 31 kWh per tonne of input. Detailed temperature measurements using 40 dataloggers in a batch of 200 t of material showed that the towers were not achieving ABPR compliance standards. Modifications to the towers, which included recirculating warm air from the top of the composting mass and auxiliary heating, are now producing ABPR-compliant CLO.
Article navigation
August 2011
Research Article|
August 01 2011
Performance of a prefabricated concrete tower composter
Edward I. Stentiford, CEng, FICE, FCIWEM, MIMechE;
Edward I. Stentiford, CEng, FICE, FCIWEM, MIMechE
Professor of Public Health Engineering
School of Civil Engineering, University of Leeds,
Leeds, UK
Search for other works by this author on:
Louise A. Fletcher, PhD;
Louise A. Fletcher, PhD
Lecturer
School of Civil Engineering, University of Leeds,
Leeds, UK
Search for other works by this author on:
John R. Barton, MCIWM;
John R. Barton, MCIWM
Senior Lecturer
School of Civil Engineering, University of Leeds,
Leeds, UK
Search for other works by this author on:
Peter G. Hobbis, PhD
Peter G. Hobbis, PhD
Formally School of Civil Engineering, University of Leeds, Leeds, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Accepted:
May 10 2010
Received:
September 07 2010
Online ISSN: 1747-6534
Print ISSN: 1747-6526
ICE Publishing: All rights reserved
2011
Proceedings of the Institution of Civil Engineers - Waste and Resource Management (2011) 164 (3): 169–177.
Article history
Accepted:
May 10 2010
Received:
September 07 2010
Citation
Stentiford EI, Fletcher LA, Barton JR, Hobbis PG (2011), "Performance of a prefabricated concrete tower composter". Proceedings of the Institution of Civil Engineers - Waste and Resource Management, Vol. 164 No. 3 pp. 169–177, doi: https://doi.org/10.1680/warm.2011.164.3.169
Download citation file:
Suggested Reading
Book review: Power Politics: Political Encounters in Industry and Engineering
Proceedings of the Institution of Civil Engineers - Energy (August,2012)
Editorial
Proceedings of the Institution of Civil Engineers - Energy (May,2007)
Editorial
Proceedings of the Institution of Civil Engineers - Energy (August,2008)
Energy: Referees for 2011
Proceedings of the Institution of Civil Engineers - Energy (February,2012)
Award-winning papers in 2010
Proceedings of the Institution of Civil Engineers - Energy (February,2012)
Related Chapters
Energy Systems, Economics, and Sustainability
Experiments on Energy, the Environment, and Sustainability
Major works – dredging and decommissioning
Reservoir Management
Seismic protection systems
Shock Transmission Units in Construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.