This paper discusses the project management and procurement of a bulk handling terminal at Bristol, for National Power. The project was complex. It involved the procurement and commissioning of materials handling plant and equipment and extensive civil and marine works. The overall project value was £110 million, of which some £70 million was in the main terminal contract. Because of the tight programme, an accelerated procedure was developed to enable the contract to be let in minimal time. A design-and-construct procurement route was selected, giving the potential for fast-track construction techniques and innovative contractor-led design. During construction, project management was by the National Power Halcrow–Soros joint project team. The integrated management team structure enabled problems to be addressed and overcome with minimal delay. The works, including environmental enhancements that were not part of the original scheme, were completed within a construction period of 22 months. The success of the project is considered to be largely due to proactive project management and the programme advantage derived from the design-and-construct form of contract. The role played by Halcrow–Soros in the project is described.
Article navigation
March 2000
Research Article|
March 01 2000
The Bristol bulk handling terminal Available to Purchase
A. C. Burdall, BEng, CEng, MICE;
A. C. Burdall, BEng, CEng, MICE
Director
Halcrow Maritime, The Halcrow Group
Swindon
Search for other works by this author on:
L. H. Muir, BE, CEng, MIEAust, MICE
L. H. Muir, BE, CEng, MIEAust, MICE
Senior Engineer
Procurement and Contracts, The Halcrow Group
Swindon
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1753-7800
Print ISSN: 1472-4561
© 2000 Thomas Telford Ltd
2000
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (2000) 142 (1): 9–19.
Citation
Burdall AC, Muir LH (2000), "The Bristol bulk handling terminal". Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering, Vol. 142 No. 1 pp. 9–19, doi: https://doi.org/10.1680/wame.2000.142.1.9
Download citation file:
Suggested Reading
Port of Newcastle, Australia: innovation at one of the world's largest coal-export terminals
Proceedings of the Institution of Civil Engineers - Civil Engineering (November,2013)
Key value engineering protocols in marine projects
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (January,2020)
Giant new Kattupalli yard and port puts India at forefront of Asian shipbuilding
Proceedings of the Institution of Civil Engineers - Civil Engineering (February,2014)
Elsewhere in ICE Proceedings
Maritime Engineering (March,2005)
Award-winning papers in 2011
Maritime Engineering (March,2013)
Related Chapters
Technology as a Catalyst for Sustainable Port Operations in Brazil
Evidence and Action on the UNSDGs: Reviews and Case Studies
The Role of Operations in a Mega Project
Crossrail Project: Infrastructure Design and Construction
Case studies
Programme Management in Construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.