In the calibration procedure adopted for most hydraulic network models, parameters are adjusted to ensure that measured and computed pressures are approximately equal. Little emphasis is placed on confirmation of a correct flowrate distribution. Such procedures can therefore promote erroneous flowrate solutions. However, it is becoming increasingly common for network models to have water quality modelling capabilities. The age of water, and many chemical reactions associated with changes in water quality are largely dependent on residence time, which is a function of the flowrate distribution. The need for greater accuracy in flowrate prediction has highlighted the need to enhance the standard calibration and verification procedure. An automated and easily repeated procedure for the empirical estimation of travel-time is described. The method involved increasing the conductivity of a pocket of water entering the network via the addition of a tracer solution, and tracking its progress using conductivity loggers. Results of the application of this method in a distribution network are compared with age of water predictions from network water quality modelling software. Discrepancies were attributable to the inaccuracy of a model calibrated using pressure alone. Large discrepancies between modelled and measured age of water existed where the flow regime was complex.
Article navigation
March 2002
Research Article|
March 01 2002
Empirical travel time estimation in a distribution network Available to Purchase
P. J. Skipworth;
P. J. Skipworth
Research Associate
Water Engineering Research Group, Civil and Structural Engineering, University of Sheffield
Search for other works by this author on:
J. Machell;
J. Machell
Project Manager
Yorkshire Water Services
Search for other works by this author on:
A. J. Saul
A. J. Saul
Professor of Water Engineering
Department of Civil and Structural Engineering, University of Sheffield
Search for other works by this author on:
Publisher: Emerald Publishing
Received:
April 28 2000
Accepted:
November 27 2000
Online ISSN: 1753-7800
Print ISSN: 1472-4561
© 2002 Thomas Telford Ltd
2002
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (2002) 154 (1): 41–49.
Article history
Received:
April 28 2000
Accepted:
November 27 2000
Citation
Skipworth PJ, Machell J, Saul AJ (2002), "Empirical travel time estimation in a distribution network". Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering, Vol. 154 No. 1 pp. 41–49, doi: https://doi.org/10.1680/wame.2002.154.1.41
Download citation file:
Suggested Reading
Frontier distance function analysis for water supply systems
Proceedings of the Institution of Civil Engineers - Municipal Engineer (March,2014)
Analysing water use efficiency and productivity in Iran's metropolises
Proceedings of the Institution of Civil Engineers - Water Management (January,2018)
Aging of low-pressure amalgam lamps and UV dose delivery
Journal of Environmental Engineering and Science (June,2014)
Modifications of a simple clogging and back-washing efficiency model for arsenic filters
Proceedings of the Institution of Civil Engineers - Water Management (February,2019)
An optimisation model for reservoir operation
Proceedings of the Institution of Civil Engineers - Water Management (August,2016)
Related Chapters
The snubber – a special type of STU for nuclear power plants and pipelines
Shock Transmission Units in Construction
Pressure testing of pipelines
Temporary Works: Principles of design and construction
Simulating Rainwater Harvesting System Performance for a Campus University in Malaysia
Water Management and Sustainability in Asia
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
