Keywords: dams, barrages & reservoirs
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (2003) 156 (1): 63–72.
Published: 01 March 2003
... made from a concrete encased steel frame with reinforced concrete slabs and infill walls. The overall height of the tower is 24·5 m. Fig. 2. Sections through Glascarnoch intake tower dams, barrages & reservoirs seismic engineering mathematical modelling Intake and outlet...
Journal Articles
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (2002) 154 (3): 177–188.
Published: 01 September 2002
.../year, which were less than the long-term average values of 23 billion m3/year and 0·58 billion t/year. 22 09 2000 05 09 2001 © 2002 Thomas Telford Ltd 2002 dams, barrages & reservoirs floods & floodworks river engineering Several devastating floods...
Journal Articles
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (2002) 154 (3): 239–245.
Published: 01 September 2002
... Thomas Telford Ltd 2002 dams, barrages & reservoirs hydraulics & hydrodynamics mathematical modelling NOTATION AV valve area B culvert height b valve opening height Cd lock discharge coefficient...
Journal Articles
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (2002) 154 (2): 103–107.
Published: 01 June 2002
... Alexandra Dock (QAD) channel. dams, barrages & reservoirs floods & floodworks hydraulics & hydrodynamics © 2002 Thomas Telford Ltd 2002 26 02 2002 13 03 2002 The settling velocity of suspended mud cannot be measured in the laboratory because of the need...
Journal Articles
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (2002) 154 (2): 93–102.
Published: 01 June 2002
... 2002 dams, barrages & reservoirs floods & floodworks hydraulics & hydrodynamics The hydraulic studies for the Cardiff Bay Barrage began in 1985 with a pre-feasibility study undertaken by Wallace Evans and Partners (WEP). This addressed the key issues of flooding, siltation...
Journal Articles
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (2002) 154 (2): 149–156.
Published: 01 June 2002
... of the lintel seal. The total discharge capacity of the sluices is 2300 m3/s. dams, barrages & reservoirs maritime engineering mechanical engineering The main items of hydromechanical equipment located in the Cardiff Bay Barrage can be split into three main areas: sluice...
Journal Articles
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (2002) 154 (2): 137–148.
Published: 01 June 2002
... Telford Ltd 2002 cofferdams & caissons dams, barrages & reservoirs maritime engineering The Cardiff Bay Barrage forms the centre-piece of the Cardiff Bay development, and has transformed the local environment by turning tidal mudflats into a fresh water lake. It is the latest...
Journal Articles
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (2002) 154 (2): 89–92.
Published: 01 June 2002
... additional flow capacity in order to ensure that flood risk is not increased when a gate is removed for re-coating off site. Following the successful operation last year, it is expected that two more gates may be re-coated this summer. dams, barrages & reservoirs environment urban regeneration...
Journal Articles
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (2002) 154 (2): 81–88.
Published: 01 June 2002
... environmental concerns. 05 12 2001 03 04 2002 © 2002 Thomas Telford Ltd 2002 dams, barrages & reservoirs ports, docks & harbours urban regeneration Cardiff, the capital city of Wales, owes its prosperity to the coal and steel industries that were established...
Journal Articles
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (2001) 148 (1): 25–37.
Published: 01 March 2001
... to determine the crest elevation for each alignment. 22 10 1999 15 08 2000 © 2001 Thomas Telford Ltd 2001 dams, barrages & reservoirs embankments water supply Advising others on possible sites for agricultural water storage in the Fens led Binnie Black & Veatch...
Journal Articles
Journal Articles
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (2001) 148 (1): 39–45.
Published: 01 March 2001
.... Information concerning wall pressures is expected to be useful in the design of deflectors in tunnels and spillways. 25 11 1999 07 09 2000 © 2001 Thomas Telford Ltd 2001 dams, barrages & reservoirs hydraulics & hydrodynamics NOTATION B height of the ramp Cp...
Journal Articles
Proceedings of the Institution of Civil Engineers - Water and Maritime Engineering (2000) 142 (4): 197–215.
Published: 01 December 2000
... the flows to be released can be large, with the need to dissipate safely reservoir head downstream of the dam, and where public safety downstream may be a consideration. © 2000 Thomas Telford Ltd 2000 dams, barrages & reservoirs water supply 16. A secondary inlet was provided...
Journal Articles

or Create an Account

Close subscription notice
Close access options