Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-3 of 3
Keywords: SARIR
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
THE LIBYAN GREAT MAN-MADE RIVER PROJECT. PAPER 2. THE WATER RESOURCE.
Available to Purchase
Proceedings of the Institution of Civil Engineers - Water Maritime and Energy (1994) 106 (2): 123–145.
Published: 01 June 1994
... on thestatus and the central eas(tSirt) andthe south east potential for further groundwater development. (Kufra) basins, each t o supply 1 million m3 These and other studies resuilnt the main per day (MCMD) ofwater to the eastern groundwater areas being delineateda s shown Sarir-Sirt and Tazerbo-Benghazi (SSTB...
Journal Articles
THE LIBYAN GREAT MAN-MADE RIVER PROJECT PHASE 1. PAPER 4. CONVEYANCE SYSTEM: DESIGN.
Available to Purchase
Proceedings of the Institution of Civil Engineers - Water Maritime and Energy (1994) 106 (2): 165–178.
Published: 01 June 1994
... PRESTRESSED CONCRETE CYLINDERS HEADERS TANKS HEADERS TANKS SAHARA SARIR TAZERBO SIRT BENGHAZI LIBYA AFRICA The Libyan Great Man-Made River Project PhaseI Paper 4. Conveyancesystem:design Young Hwan Kim and D. Greatbatch, BSc, CEng, FICE, MIWEM. MlMgt Proc. Instn Civ. Engrs Wat...
Journal Articles
THE LIBYAN GREAT MAN-MADE RIVER PROJECT PHASE 1. PAPER 3. CONVEYANCE SYSTEM HYDRAULICS AND CONTROL.
Available to Purchase
Proceedings of the Institution of Civil Engineers - Water Maritime and Energy (1994) 106 (2): 147–164.
Published: 01 June 1994
...M M GUSBI; M HIND; R PRABHAKARA RAO; R P RAO SAHARA SARIR AJDABIYA SIRT BENGHAZI LIBYA AFRICA The Libyan Great Man-Made River Project PhaseI Paper 3.Conveysaynscteem hydraulics and control M. M. Gusbi, BSc(Eng), MSc(Eng)P, hD, M.Hind, BSc(Eng),DipEng, and R. Prabhakara Rao,BEng...
