Keywords: TRENCHES
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
Proceedings of the Institution of Civil Engineers - Water Maritime and Energy (1998) 130 (1): 11–23.
Published: 01 March 1998
... of the cofferdam the 2 units were placed directly into a dredged 3 trench where a gravel bed was prepared 4 by backhoe excavator using new control 5 techniques. The programme was 6 constrained by SSSI restrictions but the 7 project was completed within 12 months 8 of the contract being awarded. 9 4011 Keywords...
Journal Articles
Proceedings of the Institution of Civil Engineers - Water Maritime and Energy (1996) 118 (4): 237–245.
Published: 01 December 1996
... problems. 4. This paper presents a critical review of such a mobile bed model. Results from the simulation of two test cases areemployed. The first is the hypothetical trench infilling test simulated by Armanini andDi Silvio,' and the second a simulationof a bed armouring experiment described by Taitet...
Journal Articles
Proceedings of the Institution of Civil Engineers - Water Maritime and Energy (1994) 106 (2): 179–189.
Published: 01 June 1994
... pipelines were ing work in this country. Thisprovided direct paid as fixed price lump sums.Pipe production, communications with the Owner s consulting trench excavation and pipelayingwere, engineer, Brown & Root (UK)(Fig. 2). however, on a remeasured basis. The totalcon- tract sum amounted toUS $3.3 billion...

or Create an Account

Close subscription notice
Close access options