This paper investigates the effect of non‐normality errors on the economic design of x‐control charts. The measurable quality characteristic of the product is assumed to be non‐normally distributed random variable. The process is subject to a single assignable cause with exponentially distributed occurrence time. This assignable cause shifts the process from in‐control state to out‐of‐control state. The economic design of x‐chart involves optimal determination of the design parameters so as to minimize the expected total cost. The optimal value of the design parameters are obtained using a computerized search technique. Consequently, the effect of non‐normality parameters and errors on the design parameters and on the loss‐cost function is explained through numerical examples.
Article navigation
1 April 1983
Review Article|
April 01 1983
MODELLING ‐CHART UNDER NON‐NORMALITY AND INSPECTOR ERRORS
M.A. RAHIM;
M.A. RAHIM
Department of Industrial Engineering, University of Windsor, Windsor, Ontario N9B 3P4, Canada
Search for other works by this author on:
A. RAOUF
A. RAOUF
Department of Industrial Engineering, University of Windsor, Windsor, Ontario N9B 3P4, Canada
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-7883
Print ISSN: 0368-492X
© MCB UP Limited
1983
Kybernetes (1983) 12 (4): 257–262.
Citation
RAHIM M, RAOUF A (1983), "MODELLING ‐CHART UNDER NON‐NORMALITY AND INSPECTOR ERRORS". Kybernetes, Vol. 12 No. 4 pp. 257–262, doi: https://doi.org/10.1108/eb005663
Download citation file:
New and popular articles
Suggested Reading
Posterior Analysis of Inspector Accuracy
International Journal of Quality & Reliability Management (February,1989)
A Study of Inspection Performance and the Personality of Quality Inspectors
International Journal of Quality & Reliability Management (April,1994)
The role of H.M. Inspector
Education + Training (February,1976)
The impact of feedback training for inspectors
European Journal of Training and Development (January,2013)
Non‐normality in Statistical Process Control Measurements
International Journal of Quality & Reliability Management (August,1994)
Related Chapters
So Near and Yet So Far: A Rigorous and Independent Inspectorate?
Rebuilding the Fire and Rescue Services: Policy, Delivery and Assurance
The Evolution of the Federal Inspector General Community: Finding Its Voice and Strengths
Inspectors General: Duty, Authority, Integrity
Five Short Years: The Formation and Destruction of an Office of Inspector General
Inspectors General: Duty, Authority, Integrity
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
