Presents a simulation model of the “Contract change process” for an aerospace manufacturing firm. The model was developed to simulate the activities from the time when a customer’s request is received to the two points in time where a preliminary schedule and a formal proposal is returned to the customer. The model was developed in a two‐stage approach. First, the process was studied and documented in US Air Force integrated computer aided manufacturing definition language for function modeling an IDEF0 model which defined the relationships between each pair of activities. Second, using the structural information provided by the IDEFo model, a simulation model using simulation language for alternative modeling (SLAMII) was developed. Data were obtained from archival sources in the department’s database. The data were analyzed according to the quarter in which they were received. From this, arrival time data distributions were estimated for each of the four quarters to capture the seasonality element in the company’s business. Next, the data were separated into three levels of difficulty to define complex, routine and simple tasks. From this, three distributions of activity times were developed for each set of tasks. The results will allow for the study of reengineering and downsizing decisions for the contract change process in the aerospace industry, under conditions of seasonal and task complexity variations.
Article navigation
1 August 1999
Technical Paper|
August 01 1999
Research communications: A simulation model of the “contract change” process Available to Purchase
James Hoyt;
James Hoyt
College of Business Administration, Troy State University, Troy, Alabama, USA, and
Search for other works by this author on:
Faizul Huq
Faizul Huq
Information Systems and Management Sciences, College of Business Administration, University of Texas at Arlington, Arlington, Texas, USA
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-7883
Print ISSN: 0368-492X
© MCB UP Limited
1999
Kybernetes (1999) 28 (6-7): 826–836.
Citation
Hoyt J, Huq F (1999), "Research communications: A simulation model of the “contract change” process". Kybernetes, Vol. 28 No. 6-7 pp. 826–836, doi: https://doi.org/10.1108/03684929910283277
Download citation file:
122
Views
Suggested Reading
Is lean manufacture universally relevant? An investigative methodology
International Journal of Operations & Production Management (September,1997)
The supply chain issue - an overview
Aircraft Engineering and Aerospace Technology: An International Journal (December,1999)
Water jet cutting at Dunlop Precision
Aircraft Engineering and Aerospace Technology: An International Journal (April,2002)
A framework for BPML assessment and improvement: A case study using IDEF0 and eEPC
Business Process Management Journal (June,2009)
Agile manufacturing in the aerospace industry: an industrial viewpoint
International Journal of Agile Management Systems (April,1999)
Related Chapters
Workforce Downsizing and Shareholder Value Orientation among Executive Managers at Large U.S. Firms
Emerging Conceptions of Work, Management and the Labor Market
The Influence of Organizational Culture and Manager Communion on the Discretionary Labor Cost Reduction Decision
Advances in Management Accounting
OVERVIEW OF CONCRETE MODELLING
Applications of Nanotechnology in Concrete Design: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 7 July 2005
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
