Article navigation
Purpose

The purpose of this paper is to present a model to determine which roads to be built in each stage with limited budget.

Design/methodology/approach

A multistage network discrete expansion model with budget restriction is formulated and a heuristic algorithm is developed by the technique of comparing the original shortest paths and the sum of crossed shortest paths to avoid computing the shortest paths matrix repeatedly.

Findings

The optimal approach has a very significant effect in finding which roads to be built by the largest net benefit.

Research limitations/implications

The paper discusses a new multistage network discrete expansion problem is the main research implications.

Practical implications

The optimal choice for road building schedule of new urban district when budgets were limited.

Originality/value

The paper presents a model and an algorithm for the optimization of road building schedule based on budget restriction.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal