Purpose

The purpose of this paper is to establish the optimization model and solve the short‐term economic dispatch of cascaded hydro‐plants.

Design/methodology/approach

An improved particle swarm optimization (IPSO) approach is proposed to solve the short‐term economic dispatch of cascaded hydroelectric plants. The water transport delay time between connected reservoirs is taken into account and it is easy in dealing with the difficult hydraulic and power coupling constraints using the proposed method in practical cascaded hydroelectric plants operation. The feasibility of the proposed method is demonstrated for actual cascaded hydroelectric plant.

Findings

The simulation results show that this approach can prevent premature convergence to a high degree and keep a rapid convergence speed.

Research limitations/implications

The optimal values of parameters in the proposed method are the main limitations where the method will be applied to the economic operation of the hydro‐plant.

Practical implications

The paper presents useful advice for short‐term economic operations of the hydro‐plant. A new optimization method to solve the short‐term optimal generation scheduling is proposed. The optimal generation power and water discharge during the whole dispatching time for hydro‐plant operation can be obtained.

Originality/value

The IPSO method is realized by maintaining high diversity of the swarm during the optimization process and preventing premature convergence.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal