Article navigation
Purpose

Maximum-flow of an uncertain multi-owner network has become very important recently. This study aims to evaluate the maximum flow on a cooperated logistic system in the presence of uncertainties, raised by travel time, capacity, cost and failures.

Design/methodology/approach

To consider different uncertainties and to promote network efficiency, the proposed model is enriched with a cooperative game methodology and a reliability method. A scenario-based method covers optimistic, pessimistic and most likely estimates time, cost and capacity of each route as well as applies a prior failure pattern for breakdown of any resource.

Findings

A linear optimization model, which is enriched with target reliability estimation, is presented. Results on a water distribution network indicate more revenue performance for players. Carrying out sensitivity analysis shows the importance of the model parameters.

Originality/value

Modeling maximum-flow problem in the presence of many sources of uncertainty with the aim of a cooperative game is the main contribution of the present study. Also, a novel method based on the reliability theory is applied to close the chasm on evaluating the real maximum flow in a shared decentralized network which suffers from risky conditions on arcs and nodes.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close subscription notice
Close access options