Open figure viewer
A simulation model developed to study the performance of a JIT production planning system with respect to the reduction of inventory costs and customer delivery intervals is described by Cagatay Buyukkoc and Kiran M Rege of AT & T Bell Laboratories, USA.
This content is only available via PDF.
© MCB UP Limited
1988
You do not currently have access to this content.
