Rework has become an endemic feature of the procurement process in construction, which invariably leads to time and cost overruns in projects. Thus, in order to improve the performance of projects it is necessary to identify the causes and costs of rework. The research presented in this paper quantifies the causes, magnitude and costs of rework experienced in two Australian construction projects procured using different contractual arrangements. The causes and costs of rework projects are analyzed and discussed. The case study projects’ rework costs were found to be 3.15 per cent and 2.4 per cent of their contract value. Changes initiated by the client and end‐user, as well as errors and omissions in contract documentation, were found to be the primary causes of rework. Recommends that construction companies and consultant firms, particularly design consultants, implement quality management practices as well as place greater attention on the design development process, to prevent rework emerging during the project’s later stages.
Article navigation
1 June 2003
Case Report|
June 01 2003
Capturing rework costs in projects
Peter E.D Love;
Peter E.D Love
School of Management Information Systems, Edith Cowan University, Perth, Australia
Search for other works by this author on:
Amrik S. Sohal
Amrik S. Sohal
Department of Management, Faculty of Business and Economics, Monash University, Caulfield East, Australia
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-7735
Print ISSN: 0268-6902
© MCB UP Limited
2003
Managerial Auditing Journal (2003) 18 (4): 329–339.
Citation
Love PE, Sohal AS (2003), "Capturing rework costs in projects". Managerial Auditing Journal, Vol. 18 No. 4 pp. 329–339, doi: https://doi.org/10.1108/02686900310474343
Download citation file:
New and popular articles
Suggested Reading
A revealing study of Six Sigma: Gains but missed potential
Strategic Direction (September,2003)
Reverse logistics capabilities: antecedents and cost savings
International Journal of Physical Distribution & Logistics Management (April,2010)
A fuzzy competence requirement (FCR) model for competitive bidding strategy
Construction Innovation: Information Process Management (January,2010)
Reworks causes and related costs in construction: case of Parand mass housing project in Iran
International Journal of Quality & Reliability Management (May,2019)
ISO 9000 quality assurance in Singapore’s construction industry: an update
Structural Survey (September,1997)
Related Chapters
MNC Headquarters as Global Network Orchestrators: Insights from Headquarters Relocation Patterns in Europe
Orchestration of the Global Network Organization
History of Quality
Quality Management: Tools, Methods, and Standards
Why We've Struggled to Embed So Far
The Smart Building Advantage: Unlocking the value of smart building technologies
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.