Skip to Main Content
Article navigation
Purpose

This paper aims to explore how manufacturing organisations’ performance measurement and management (PMM) systems are evolving when digital technologies (DTs) are deployed. It focusses on the operational level, asking whether DTs are used to promote command-and-control or empowerment-oriented performance management.

Design/methodology/approach

The findings are based on a single case study from a department of a Norwegian electrochemical plant. The department recently implemented a performance measurement system (PMS) supported by DTs to capture, analyse and visualise close-to-real-time performance data on individuals and teams. The authors analysed both the management practices associated with the new PMS and how those related to other PMM-subsystems in the organisation.

Findings

When seen in isolation, the new PMS was used to promote empowerment and operators reported a significant increase in perceived psychological empowerment. However, other parts of the organisation’s PMM system remained control-oriented, so that the overall balance between control and empowerment remained stable.

Practical implications

New PMSs might be added to support local needs and create arenas for empowerment without disturbing the overall balance in the PMM system.

Originality/value

Building on the insights from the case study, the authors propose that DTs may be deployed to promote both command-and-control and empowerment within different PMM subsystems in the same organisation. Hence, the deployment of DTs is likely to have contradictory effects, which are best understood through a “system of systems” perspective on PMMs.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal