Open figure viewer
This case study in the textile industry illustrating a new approach to scheduling and stock control describes the use of a computer to give faster feedforward of planning information. The principle is one likely to be of widespread use in industry.
This content is only available via PDF.
© MCB UP Limited
1971
You do not currently have access to this content.
