Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-3 of 3
Keywords: Project teams
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Journal:
Management Decision
Management Decision (2008) 46 (7): 1052–1065.
Published: 01 August 2008
... a gap analysis based on the mean scores for the WPM's and his/her project team that shows the overall relative differences (as shown in Table III). The second way of analysing the data is to record the frequency of the gap differences for each respondent between the WPM and his/her team that shows...
Journal Articles
Journal:
Management Decision
Management Decision (2005) 43 (7-8): 1032–1039.
Published: 01 August 2005
... in problem solving and to carry out tasks successfully. Outcomes linked to this leadership role are maintaining the task orientation of the project team, particularly keeping it on time, and on budget. The other role of consideration is enacted when the leader supports team members, assists in fulfilling...
Journal Articles
Journal:
Management Decision
Management Decision (2002) 40 (7): 655–662.
Published: 01 September 2002
... in the finished construction product. © MCB UP Limited 2002 Construction industry Tendering Project teams This research is one element of an ongoing Engineering and Physical Sciences Research Council (EPSRC) sponsored study examining tender evaluation in design and build projects...
