Of vital importance to the long‐term profitability and level of investment in a company or indeed an economy is the determination of reliable hurdle rates, or minimum required rates of returns, for investment projects. Hurdle rates set too high lead to missed opportunities for profit and growth. Understating hurdle rate levels give rise to uneconomic investment decisions and fall in market values. As every financial manager faced with the problem of determining these rates of return is aware there are many different approaches, each of which, if followed mechanically, could produce very different solutions. The main reasons for such variances rest in the assumptions underlying the various approaches. This article concentrates on the application of one of the more recent approaches based on the capital asset pricing model (CAPM). Its positive orientation and intuitively appealing conclusions have made it the central equilibrium model of financial economics.
Article navigation
1 April 1980
Review Article|
April 01 1980
Calculating a Project's Hurdle Rate
Publisher: Emerald Publishing
Online ISSN: 1758-7743
Print ISSN: 0307-4358
© MCB UP Limited
1980
Managerial Finance (1980) 6 (2): 76–88.
Citation
Pike R (1980), "Calculating a Project's Hurdle Rate". Managerial Finance, Vol. 6 No. 2 pp. 76–88, doi: https://doi.org/10.1108/eb013468
Download citation file:
New and popular articles
Suggested Reading
Evaluating investment projects: The hurdle rate
Journal of Corporate Real Estate (October,2000)
“The Hurdles Analysis” as an instrument for improving sustainable stewardship
Management Research Review (March,2010)
Retrievability bias in explaining the hurdle rate premium puzzle
Journal of Applied Accounting Research (November,2016)
‘The Hurdle of the 18+’
Technical Education and Industrial Training (March,1963)
Hurdles and opportunities for Indian firms adopting business intelligence
Journal of Advances in Management Research (January,2008)
Related Chapters
Technology Intensive Indian Exports: Hurdles and Puzzles
Contemporary Issues in International Trade: Challenges and Opportunities
Chapter 4 Detecting Wage Under-Reporting Using a Double-Hurdle Model
Informal Employment in Emerging and Transition Economies
34. Partial displacement pile system for urban sites
Piling European practice and worldwide trends: Proceedings of a conference organized by the Institution of Civil Engineers, and held in London on 7–9 April 1992
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
