As plastic ball grid array(PBGA) components proliferate, card assembly questions arise about the robustness of the module to card attachment process. A designed experiment was performed to measure the sensitivity of card assembly yields to normal assembly process variation. Experimental variables include card thickness, ball pad size on the card ball grid array (BGA) site, module moisture exposure and ball planarity of a 225 I/O PBGA. Another set of PBGA test cards, assembled under optimum process conditions, was subjected to accelerated thermal cycle (ATO) testing. ATC testing also included a rework cell. Overall, the PBGA module attachment process demonstrated robustness. The initial attach and reworked modules proved to be reliable. This paper focuses on the details of the test conditions and the results.
Article navigation
1 August 1997
Research Article|
August 01 1997
Plastic Ball Grid Array Attachment: Assembly and Reliability Performance Available to Purchase
A.A. Primavera
A.A. Primavera
Universal Instruments, Binghamton, New York
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-812X
Print ISSN: 1356-5362
© MCB UP Limited
1997
Microelectronics International (1997) 14 (2): 11–15.
Citation
Anderson L, Primavera A (1997), "Plastic Ball Grid Array Attachment: Assembly and Reliability Performance". Microelectronics International, Vol. 14 No. 2 pp. 11–15, doi: https://doi.org/10.1108/13565369710800475
Download citation file:
48
Views
Suggested Reading
The Analysis of Manufacturing Processes for Plastic Ball Grid Arrays (PBGAs)
Microelectronics International (April,1997)
Assembly and Reliability of Very Large Flip‐chip on CQFP
Microelectronics International (August,1996)
Popcorning in PBGA Packages During IR Reflow Soldering
Microelectronics International (April,1997)
Packaging Reliability for High Temperature Electronics: A Materials Focus
Microelectronics International (December,1996)
Minimal Size Packaging Solutions: A Comparison
Microelectronics International (August,1996)
Related Chapters
Application of risk and reliability to the management of bridges
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
Inspection, testing and monitoring of trunk road bridges in England
Bridge Management 5: Inspection, maintenance, assessment and repair: Proceedings of the 5th International Conference on Bridge Management, organized by the University of Surrey, 11–13 April 2005
USING EN 1990 TO IMPROVE CONSISTENCY OF SAFETY FOR STRUCTURAL BUILDING MATERIALS
Application of Codes, Design and Regulations: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 5–7 July 2005
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
