Skip to Main Content
Article navigation

Compared to conventional manufacturing processes, fused deposition (FD)‐based layered manufacturing processes have dramatically reduced the part design and manufacturing time. However, it is necessary to further enhance their process productivity. To this end, improvement of FD process efficiency is studied in this paper. A build time analysis is conducted and the deposition parameters that can be used to speed up fabrication processes are identified. The tool path‐based deposition planning approach is extended for ensuring layer quality when the build process is expedited under adjusted deposition parameters. A test part was built to demonstrate the proposed approach.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal