Article navigation
Purpose

Despite the abundant renewable energy potential in the Nigeria, the power-sector stakeholder has not paid attention to the prospect of the natural resources that can be accrued when it is properly harnessed. Although a very negligible fraction of the population has invested in solar photovoltaics (PVs) for home solution, the initiative was only made public commercialised under the public-private partnership (PPP) and the objectives of the Power Sector Reform Act. 2005. It is, therefore, aimed to investigate the causes and insight of the barriers that are responsible for the slow implementation of the solar energy initiative in the Nigeria.

Design/methodology/approach

An empirical study was performed in the Nigeria. The study was conducted qualitatively, through semi-structured face-to-face interviews of 25 participants. The interviews were recorded, transcribed, interpreted, coded, categorised into themes and analysed by content analysis.

Findings

The study reveals technological, financial, political and social barriers have been the reason for slowing down solar energy development in Nigeria. While the technical barrier is a challenge to the solar energy implementation, socio-cultural issues have also been an obstacle to the implementation process. It is suggested that, the stakeholders of the initiative endeavour to proffer sustainable policies to enable public and private promoters to be able to generate and distribute electricity through solar PV and to complement the inadequate conventional electricity sources from the grids.

Originality/value

The paper provides a richer insight into the understanding and awareness of barriers for implementing solar energy strategies in Nigeria.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal