Open figure viewer
Draws on a number of recent surveys to address the issue of why corporate transformation and total quality are taking longer to achieve than was first envisaged. Concludes that a more holistic approach is required than is often applied. Successfully implementing a transformation programme depends critically on the relevance of the selection, combination and application of change elements to the requirements of the situation at each stage of the change process.
© MCB UP Limited
1993
You do not currently have access to this content.
