Article navigation

At the port of Kingston‐upon‐Hull, in the Humber Estuary, the British Transport Commission, in association with the user companies, are replacing the No. 1 oil jetty constructed in timber in 1914 with a reinforced concrete structure. The approach jetties, when fully completed, will be nearly half a mile in length and have a three‐tiered pipe‐carrying structure and approach roadway. Some 57 chemicals and oil pipes can be carried at each of the two berthing heads.

This content is only available via PDF.
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal