Open figure viewer
In the construction of this engineering feat by the North of Scotland Hydro‐Electric Board, pre‐stressed concrete was used employing the Lee McCall post‐tensioning system. The basic idea being to anchor the dam to the foundation rock by means of groups of high tensile steel rods.
This content is only available via PDF.
© MCB UP Limited
1957
You do not currently have access to this content.
