Open figure viewer
IN competition with other suppliers Hawker Siddeley Dynamics were chosen to supply a major part of the environmental control equipment for the new Hawk aircraft, specific items being the Bleed Air Pressure Reducing and Shut‐Off Valve, Cold Air Unit, Pressure Balanced Flexible Coupling, Cabin Pressure Control System, Cabin Safety Valve and two types of small Solenoid Valve.
This content is only available via PDF.
© MCB UP Limited
1975
You do not currently have access to this content.
