To maintain liquid‐tightness in an integral wing fuel tank at the junction of the stringers 12, 13 and the bulkhead 10 forming the end wall of the tank, each stringer is divided into inner and outer portions 12, 13 respectively, the webs of the two portions being in alignment and bolted to a cylindrical connector 14 passing through a hole in the bulkhead, the stringer webs being disposed in vertical longitudinal slots 25, 29 in the connector which grips the bulkhead between a collar 24 and nut 22. Scaling washers 20, 21 bear against the bulkhead and the vertical flange 18 of an angle‐section member supporting the bulkhead. The stringer dangers are riveted to the wing skin 11 and ribs 16. During assembly the web of the outer stringer section 13 is first inserted in the slot 25 and bolted to the connector 14, and the latter with the ring 21 in pisition is then passed through the hole in the bulkhead and the nut 22 and ring 20 screwed into position, after which the inner stringer section 12 is inserted in the slot 29 and bolted to the connector 14.
Article navigation
Review Article|
August 01 1953
Month in the Patent Office
Publisher: Emerald Publishing
Online ISSN: 2059-9366
Print ISSN: 0002-2667
© MCB UP Limited
1953
Aircraft Engineering (1953) 25 (8): 245–246.
Citation
(1953), "Month in the Patent Office". Aircraft Engineering, Vol. 25 No. 8 pp. 245–246, doi: https://doi.org/10.1108/eb032328
Download citation file:
95
Views
New and popular articles
Suggested Reading
Design and topological optimization of rear pressure bulkhead for a typical aircraft
Aircraft Engineering and Aerospace Technology: An International Journal (August,2021)
Key to Cutaway Drawing of B.A.C. One‐Eleven 500 Series
Aircraft Engineering (March,1967)
Fuselage structures within the CPACS data format
Aircraft Engineering and Aerospace Technology: An International Journal (March,2016)
Monocoque Stability in Compression: The Case of Buckling in Long Waves in an Unsupported Length of Panel
Aircraft Engineering (September,1939)
Month in the Patent Office
Aircraft Engineering (May,1939)
Related Chapters
Offshore construction of bulkhead waste facilities by H-joint steel pipe sheet piles
BGA International Conference on Foundations: Innovations, observations, design and practice: Proceedings of the international conference organised by British Geotechnical Association and held in Dundee, Scotland on 2 – 5th September 2003
44. On-load instrumented stringers in AGRs
Nuclear fuel performance: Proceedings of the conference held in Stratford-upon-Avon on 25–29 March 1985
12. The role of mechanical engineering in commercial AGR fuel stringer development
Nuclear Fuel Performance
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
