The steel bars account for a high percentage of material costs for the current construction projects. At the present time, most of the construction projects for the factories of thin‐film transistor liquid crystal display (TFT‐LCD) complete the transactions of steel bars when the suppliers ship the steel bars to the temporary storage/processing sites. This paper applies the buy‐in concept in the Theory of Constraint (TOC) on the supply chain of steel bars. In this study, suppliers are required to establish warehouses at the construction sites and complete the transactions when the formed and processed steel bars are shipped into the factory sites. The aim is to find a win‐win solution to meet with the expectations from constructors as they hope that there is no need to build up inventories but supply is ready at any time. Also, this paper compares and analyzes the traditional supply/inventory model of steel bars and the Demand‐Pull (D‐P) model under the TOC framework. It is proved that Vendor Management Inventory (VMI) in the D‐P model is able to more effectively manage steel bars as a material.
Article navigation
17 April 2008
Review Article|
April 17 2008
Applying Theory of Constraint on Logistic Management in Large Scale Construction Sites – A Case Study of Steel Bar in TFT‐LCD Factory Build‐Up
Chih‐Yao Huang;
Chih‐Yao Huang
Department of Industrial Engineering and Management, National Chiao‐Tung University, Hsinchu, Taiwan, ROC
Search for other works by this author on:
Ching‐Piao Chen;
Ching‐Piao Chen
Department of Industrial Engineering and Management, Ta‐Hwa Institute of Technology, 1 Ta‐Hwa Road, Chung‐Lin, Hsin‐Chu, Taiwan, ROC
Search for other works by this author on:
Rong‐Kwei Li;
Rong‐Kwei Li
Department of Industrial Engineering and Management, National Chiao‐Tung University, Hsinchu, Taiwan, ROC
Search for other works by this author on:
Chih‐Hung Tsai
Chih‐Hung Tsai
Department of Industrial Engineering and Management, Ta‐Hwa Institute of Technology, 1 Ta‐Hwa Road, Chung‐Lin, Hsin‐Chu, Taiwan, ROC
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 2054-555X
Print ISSN: 1598-2688
© Emerald Group Publishing Limited
2008
Asian Journal on Quality (2008) 9 (1): 68–93.
Citation
Huang C, Chen C, Li R, Tsai C (2008), "Applying Theory of Constraint on Logistic Management in Large Scale Construction Sites – A Case Study of Steel Bar in TFT‐LCD Factory Build‐Up". Asian Journal on Quality, Vol. 9 No. 1 pp. 68–93, doi: https://doi.org/10.1108/15982688200800005
Download citation file:
New and popular articles
Suggested Reading
Corrosion behavior of steel bar embedded in high-ductility cementitious composites under the coupled action of dry–wet cycles and chloride attack
Anti-Corrosion Methods and Materials (June,2021)
Study on corrosion monitoring and assessment method of reinforced concrete based on multi-sensor fusion
Anti-Corrosion Methods and Materials (January,2025)
Finding the weak link in the chain: an integrated performance measurement framework for complex logistics systems
Human Resource Management International Digest (October,2020)
Bottleneck analysis in multi-stage service delivery using the theory of constraints
Asia Pacific Journal of Marketing and Logistics (September,2025)
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
