Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-6 of 6
Keywords: Implementation
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Machine learning-enabled construction project management: systematic review, comparative performance synthesis and implementation framework
Available to Purchase
Built Environment Project and Asset Management 1–23.
Published: 20 January 2026
...Soheila Sadeghi; Chunling Niu; Taimoor Marjani; Reza Lotfi Purpose Machine learning (ML), a subset of artificial intelligence (AI), is increasingly transforming construction project management (CPM) processes, yet a significant gap exists between research advancements and practical implementation...
Journal Articles
Barriers to environmental impact assessment implementation for construction projects in Nigeria
Available to Purchase
Built Environment Project and Asset Management (2023) 13 (5): 719–737.
Published: 19 May 2023
... the barriers to EIA implementation for construction projects in Nigeria. Design/methodology/approach The study adopted a survey research technique. The snowball sampling approach was adopted to identify key stakeholders in EIA practice for the administration of questionnaire. A total of 187 questionnaires...
Journal Articles
Challenges to the implementation of building management systems in Saudi Arabia
Available to Purchase
Built Environment Project and Asset Management (2017) 7 (2): 130–142.
Published: 11 May 2017
...Mohammad A. Hassanain; Ameen Bin-Mohanna; Abdul-Mohsen Al-Hammad; Muizz O. Sanni-Anibire Purpose The purpose of this paper is to present an assessment of the challenges to the implementation of building management systems (BMS) in Saudi Arabia, during the life cycle of building projects. Design...
Journal Articles
A systems approach to assessing organisational viability in project based organisations
Available to Purchase
Built Environment Project and Asset Management (2016) 6 (3): 268–283.
Published: 04 July 2016
... in the determination of organisational viability (Davies, 2007), as a systemic conceptual framework, consisting of functions ranging from policy-making to implementation allowing for structuralising the linkage of these functions to one another and to the system’s external environment (Adham et al., 2012...
Journal Articles
Stakeholder perceptions on critical success factors for public-private partnership projects in Nigeria
Available to Purchase
Built Environment Project and Asset Management (2016) 6 (1): 74–91.
Published: 01 February 2016
... implementation in Nigeria. Data collected were analysed using descriptive statistics, mean score, Kruskal-Wallis test, analysis of variance (ANOVA), and factor analysis. Findings – The study revealed the result of mean score ranking, which indicated that all the stakeholders considered the identified 26...
Journal Articles
A conceptual model for evaluating infrastructure-based temporary multi-organisations
Available to Purchase
Built Environment Project and Asset Management (2015) 5 (1): 103–120.
Published: 02 February 2015
...B.O. Awuzie; P. McDermott Purpose – The absence of an effective model for conceptualising and evaluating the interorganisational relationships within infrastructure delivery systems has been blamed for the seeming inability of implementation analysts to discover the causes of implementation gaps...
