Open figure viewer
As time goes by, procedures change, needs vary, equipment wears out or becomes obsolete, and materials are offered in new formats. Thus, the library administrator overseeing the budgetary process is continually confronted with the prospect of evaluating procedures and making changes to meet new requirements, replace or repair equipment, and to purchase new material or replace existing material in new formats.
This content is only available via PDF.
© MCB UP Limited
1992
You do not currently have access to this content.
