Economic construction techniques: Proceedings of the conference Economic construction techniques: temporary works and their interaction with permanent works, organized by the Institution of Civil Engineers and held in London on 16 November 1988
Emerald Publishing Limited
ISBN print:
978-0-7277-4704-4
Publication date:
1989
Book Chapter
3. Sub-structure techniques for excavation support
By
D. A. GREENWOOD, BSc, PhD, FGs
D. A. GREENWOOD, BSc, PhD, FGs
Cementation, Piling and Foundations Limited
Search for other works by this author on:
D. A. GREENWOOD, BSc, PhD, FGs
Cementation, Piling and Foundations Limited
-
Published:1989
Citation
D. A. GREENWOOD, BSc, PhD, FGs, 1989. "3. Sub-structure techniques for excavation support", Economic construction techniques: Proceedings of the conference Economic construction techniques: temporary works and their interaction with permanent works, organized by the Institution of Civil Engineers and held in London on 16 November 1988
Download citation file:
Open figure viewer
Synopsis
Introduction
The Engineering - Commercial Environment
Bored Pile Retaining Walls
Deep Soil Stabilisation by Mix-in-Place
Soil Nailing for Excavation Support
Root Piles
Vacuum Stabilisation by Water Ejectors
Concluding Commentary
You do not currently have access to this chapter.
Email alerts
Related Book Content
Related Articles
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
