Boiler dynamics and control in nuclear power stations 2
Emerald Publishing Limited
ISBN print:
978-0-7277-5065-5
Publication date:
1980
Book Chapter
25. AGR design and simulator reference dynamic total plant models
By
P. Dulson, MA, CEGB
P. Dulson, MA, CEGB
Generation Development and Construction Division, Barnwood
Search for other works by this author on:
P. Dulson, MA, CEGB
Generation Development and Construction Division, Barnwood
-
Published:1980
Citation
P. Dulson, MA, CEGB, 1980. "25. AGR design and simulator reference dynamic total plant models", Boiler dynamics and control in nuclear power stations 2
Download citation file:
Open figure viewer
Introduction
Reference Models for A.G.R. Training Simulators
Models for Design Purposes
The Design and Simulator Reference Models
Reactor Representation
Boiler Representation
Primary Circuit Representation
Feed System, Steam Mains and Turbine Representation
Control System and Plant Protection Representation
Solution of Model Equations: P.M.S.P.
Simulator Applications of Models
Design Applications of Models
Safety Studies Applications of Models
Model Validation
Future Model Developments
Conclusions
Acknowledgement
You do not currently have access to this chapter.
Email alerts
Related Book Content
Related Articles
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
