21. Design and construction of immersed tube offshore cooling water tunnels at Sizewell ‘B’ power station
-
Published:1991
J.T. Vaughan, D.T. Williams, 1991. "21. Design and construction of immersed tube offshore cooling water tunnels at Sizewell ‘B’ power station", Civil engineering in the nuclear industry: Proceedings of the conference organized by the Institution of Civil Engineers and held in Windermere on 20–22 March 1991, R Dexter-Smith
Download citation file:
Steam used to drive the turbine generators at Sizewell ‘B’ Nuclear Power Station is cooled by passing through condensers where heat is transferred to cool sea water pimped through the Cooling Water System. The paper describes the initial investigations, design, and construction of the offshore tunnels used to draw cool water from 800m offshore and discharge the warmed water 200m offshore.
SYNOPSIS
COOLING WATER SYSTEM
SITE GEOD0GY
INITIAL STUDIES
DESIGN
ENGINEER'S REFERENCE DESIGN
PRELIMINARY INVESTIGATTONS
ENQUIRY AND TENDER ASSESSMENT
DEVELOPMENT AND FINAL DESIGN
CONSTRUCTION
ACKNOWLEDGEMENTS