Results of experimental and startup adjustment works on the steam generators of the BN 350 installation
-
Published:1974
S. M. Blagovolin, R. P. Baklushin, V. G. Fedorov, E. M. Grdlichko, Y. M. Gubanov, S. A. Logvinov, B. I. Lukasevich, A. V. Nekrasov, V. V. Stekol'nikov, D. S. Yurchenko, 1974. "Results of experimental and startup adjustment works on the steam generators of the BN 350 installation", Fast Reactor Power Stations
Download citation file:
Investigation of Circulation Characteristics of the Field Channel
Thermal Enginerrring Tests and Investigation of Circulation on Multitube Models
Investigation of Resistance to Corrosion of the Steel Flowing Formation and Composition and Nature of Deposits in the Field Channels.
Development of Evaporator Run-Up Conditions Prior to Filling the Loop With Sodium
Data on Startup - Adjustment .And the Initial Period of Steam Generator Operation
Conclusions
