Pumping tests play an important role in the design of construction dewatering systems. This Paper discusses the application of pumping test analyses to construction dewatering systems and highlights the advantages and limitations of the available techniques for a range of problems encountered in practice.

  • Introduction

  • Construction dewatering systems

  • Pumping tests in medium to high permeability conditions

  • Cumulative drawdown method

  • Pumping trials

  • The observational method

  • Groundwater chemistry

  • Conclusion

  • References

This content is only available via PDF.
You do not currently have access to this chapter.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.