Shon Sheffrey Reservoir – Labyrinth overflow and replacement of masonry spillway
-
Published:2014
R J TERRELL, D M PRISK, J C ACKERS, 2014. "Shon Sheffrey Reservoir – Labyrinth overflow and replacement of masonry spillway", Maintaining the Safety of our Dams and Reservoirs: Proceedings of the 18th Biennial Conference of the British Dam Society at Queen’s University, Belfast, from 3–6 September 2014, Andrew Pepper
Download citation file:
SYNOPSIS
Lack of adequate freeboard and concerns over ability of a masonry spillway to pass the design flood were resolved by providing a labyrinth weir and replacing the masonry spillway. The existing spillway was evaluated using computational fluid dynamics and the design was tested by physical modelling. The design rehabilitated the reservoir by providing improved freeboard and durability to withstand the design flood.