• Introduction

  • Assessment of Abnormal Load Carrying Capacity

  • Principal Inspection (1980)

  • Repair Work

  • Inspection, Load Assessment and Repair of Wadham Road Viaduct

  • Assessment of Abnormal Load Carrying Capacity

  • Principal Inspection (1980)

  • Recent Load Assessment Work

  • Lea Valley Viaduct BD21/84 Load Assessment

  • Multi-Bay Spans

  • Columns

  • Spans Over Waterways

  • Wadham Road Viaduct BD 21/84 Load Assessment

  • Conclusion

  • Acknowledgements

You do not currently have access to this chapter.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.