DR J. SZEKESSY (URENCO Ltd): Could Mr Hopkins

please indicate a time schedule for CIP and CUP?

MR HOPKINS: CIP began in 1973 and is currently

scheduled to be completed in late 1981.

DR W. H. WOLF (SWUCO, USA): Product to stock pile was given as 3.27. enriched. Why this assay in particular?

MR HOPKINS: The assay of 3.2% 235U is the esti

mate we have of the predominant future require

ment of the power reactor operators.

DR G. B. SCURICINI (Comitato Nazionale per

1'Energia Nucleare, Italy): The length of the

converter is stated to be 5.8m; deducing the

length of the cooler, the diffuser length is of