This paper describes the design and construction process for the West Breakwater of the Outer Port of A Coruña (Spain), focusing on the technological advantages of Cubipod®. The West Breakwater is the second phase of the 1,350 m-long secondary breakwater which will shelter the harbour from the western storms; the 450 m-long South Breakwater, completed in 2013, was the first phase. In addition to completing the secondary breakwater, the project included quays and reclamation works inside the basin. Figure 1 shows the location of the Outer Port of A Coruña.

Figure 1

Location of the Outer Port of A Coruña

Figure 1

Location of the Outer Port of A Coruña

Close modal

The original Port Authority design was based on a Level III probabilistic approach and validated with 1/51-scale 3D physical tests performed by GEAMA (Universidade da Coruña) in the CITTEC facilities. Alternative design was awarded with the contract, using a Cubipod® armour design. A single-layer armour was used in the trunk, but given client specifications, a double-layer armour was required for the roundhead.

The Cubipod® is proprietary armour unit invented in 2005 by J.R. Medina and M.E. Gómez-Martín at the Universitat Politècnica de València (UPV). During this project, new challenges had to be faced, such as constructing a transition between single- and double-layer armours (what was solved by modifying the filter thickness of single- and double-layer armours to keep a homogeneous external armour profile) and manufacturing and handling of 45-tonne Cubipods. Construction finished in November 2016 with no problems or delays in schedule.

You do not currently have access to this chapter.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.