The cladding of a modern building is a critical, and expensive, specialist sub‐system of the total building. This paper is concerned with modelling the supply chain processes within the building cladding sector of the UK construction industry. The modelling was conducted within the context of CIMclad, a research project involving a consortia of universities and industry that is seeking to move the cladding sector towards computer integrated design and manufacture. The goal was to better understand the existing supply chain processes. These processes are complex and span a diverse range of players, each of whom may play one or more roles. The methodology employed was a combination of informal mapping of the procurement chain and the application of formal process modelling techniques.
Article navigation
1 December 2004
Editors
Elena-Madalina Vatamanescu
Elena-Madalina Vatamanescu
Search for other works by this author on:
Research Article|
December 01 2004
Modelling the building cladding attainment processes
Abdulla Kalian;
Abdulla Kalian
CAE Group, School of Civil Engineering, Leeds University, Leeds, UK
Search for other works by this author on:
Alastair Watson;
Alastair Watson
CAE Group, School of Civil Engineering, Leeds University, Leeds, UK
Search for other works by this author on:
Emeka Agbasi;
Emeka Agbasi
Department of Civil and Building Engineering, Loughborough University, Loughborough, UK
Search for other works by this author on:
Chimay Anumba;
Chimay Anumba
Department of Civil and Building Engineering, Loughborough University, Loughborough, UK
Search for other works by this author on:
Alistair Gibb
Alistair Gibb
Department of Civil and Building Engineering, Loughborough University, Loughborough, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-4116
Print ISSN: 1463-7154
© Emerald Group Publishing Limited
2004
Business Process Management Journal (2004) 10 (6): 712–723.
Citation
Kalian A, Watson A, Agbasi E, Anumba C, Gibb A (2004), "Modelling the building cladding attainment processes". Business Process Management Journal, Vol. 10 No. 6 pp. 712–723, doi: https://doi.org/10.1108/14637150410567893
Download citation file:
New and popular articles
Suggested Reading
The future of windows and cladding in the UK
Structural Survey (February,1991)
Cladding sector road map for realising the CIM vision
Industrial Management & Data Systems (August,2004)
The Use of Fluorescent Dyes in Highlighting Some Construction Problems
Structural Survey (December,1994)
Pre‐coated metal cladding – evaluating failures
Structural Survey (April,1991)
Modularity in supply chains: a multiple case study in the construction industry
International Journal of Operations & Production Management (June,2006)
Related Chapters
Building contents
Earthquake Design Practice for Buildings
Introduction
Thermal Insulation Materials for Building Applications: The complete guide
Types of thermal insulation materials
Thermal Insulation Materials for Building Applications: The complete guide
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.