An accurate estimation of project costs is always a great challenge for a construction company, particularly when there is a commitment with the owner to achieve a project at a given price. It is thus essential to develop technical and logistic solutions (TLS) ensuring a good organisation and improving the productivity. These improvements are not yet well assessed because relevant models are not available at the right time. This paper presents a new approach for assessing productivity by using an analytical cost model and indicators widely used to measure the site productivity. A case study is described to validate the cost and indicator model. They can be used in a decision making process consisting of a comparative study of different TLS in order to select, in a predicted term, the TLS ensuring the best productivity. A decision support system for generating different alternatives to be compared is currently under development.
Article navigation
1 June 2002
Research Article|
June 01 2002
A new cost control model and indicators to measure productivity on building sites Available to Purchase
Emad Al Abo Omar;
Emad Al Abo Omar
Laboratoire Génie Civil et Habitat, Ecole Supérieure d’InGEnieurs de Chambéry, Université de Savoie, France
Search for other works by this author on:
Jean‐Claude Mangin
Jean‐Claude Mangin
Laboratoire Génie Civil et Habitat, Ecole Supérieure d’InGEnieurs de Chambéry, Université de Savoie, France
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1477-0857
Print ISSN: 1471-4175
© MCB UP Limited
2002
Construction Innovation: Information Process Management (2002) 2 (2): 83–101.
Citation
Al Abo Omar E, Mangin J (2002), "A new cost control model and indicators to measure productivity on building sites". Construction Innovation: Information Process Management, Vol. 2 No. 2 pp. 83–101, doi: https://doi.org/10.1108/14714170210814720
Download citation file:
Suggested Reading
Preliminary cost forecasting and optimization for the construction of steel pedestrian bridges in Egypt
Engineering, Construction and Architectural Management (December,2023)
Emission/fuel energy restricted dynamic optimal power flow using fuzzy - ant lion optimizer
International Journal of Energy Sector Management (June,2017)
Applying the bootstrap method to newsvendor model incorporating group buying for optimal price discount and order quantity
Kybernetes (November,2017)
Relationships between total construction cost and design related variables
Journal of Financial Management of Property and Construction (March,2007)
DuPont analysis and dividend policy: empirical evidence from Malaysia
Pacific Accounting Review (February,2018)
Related Chapters
Models and Misperceptions: Chenery, Hirschman and Tinbergen on Development Planning
Research in the History of Economic Thought and Methodology
Decision-Making Power and Institutional Logic in Higher Education Institutions: A Comparative Analysis of European Universities
Towards A Comparative Institutionalism: Forms, Dynamics And Logics Across The Organizational Fields Of Health Care And Higher Education
Communication Professionals and Organisational Decision-Making: A Finnish Study of Practitioner Roles
The Management Game of Communication
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.