A change order is an order from an employer authorizing a variation. Success in managing change orders results in uninterrupted construction operations and an agreed final project cost as well as duration. One of the methods to manage change orders is to establish good communication and cooperation among project team members. Success of this method can be enhanced by developing and utilizing a web‐based change order management system that supports documentation practice, communication and integration between different team members in the change order workflow. This paper discusses our web‐based project management system, change order management system (COMS), to manage change orders using the Internet. In order to show COMS’ potential benefits, a test case was conducted for comparing the COMS with the conventional practice of change order management.
Article navigation
1 December 2003
Technical Paper|
December 01 2003
Web‐based application for managing change orders in construction projects
C. Charoenngam;
C. Charoenngam
School of Civil Engineering, Asian Institute of Technology, Pathumthani, Thailand
Search for other works by this author on:
S.T. Coquinco;
S.T. Coquinco
School of Civil Engineering, Asian Institute of Technology, Pathumthani, Thailand
Search for other works by this author on:
B.H.W. Hadikusumo
B.H.W. Hadikusumo
School of Civil Engineering, Asian Institute of Technology, Pathumthani, Thailand
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1477-0857
Print ISSN: 1471-4175
© MCB UP Limited
2003
Construction Innovation: Information Process Management (2003) 3 (4): 197–215.
Citation
Charoenngam C, Coquinco S, Hadikusumo B (2003), "Web‐based application for managing change orders in construction projects". Construction Innovation: Information Process Management, Vol. 3 No. 4 pp. 197–215, doi: https://doi.org/10.1108/14714170310814936
Download citation file:
New and popular articles
Suggested Reading
Modelling the logical structure of books and journals using augmented transition network grammars
Journal of Documentation (February,2003)
Effect of change orders on rework in highway projects in Palestine
Journal of Financial Management of Property and Construction (April,2017)
Probability of change orders and the effect on cost and schedule for new public school buildings
Engineering, Construction and Architectural Management (April,2019)
Measuring sensitivity to change orders in construction projects using eigenvector centrality and radius of gyration
Engineering, Construction and Architectural Management (January,2023)
Change order effects on labor productivity and mitigation the effects by developing policies using system dynamic modeling: a case study in a construction project
International Journal of Building Pathology and Adaptation (July,2023)
Related Chapters
Riding on the Waves of Change: Towards Pulsating Normality as a Process of Routinizing Novelty
Routine Dynamics: Organizing in a World in Flux
Aspects of Research and Development Contract Terms in the Bio/Pharmaceutical Sector
The Economics of Medical Technology
DOCUMENTATION OF ELECTROCHEMICAL MAINTENANCE METHODS
Challenges of Concrete Construction: Volume 3, Repair, Rejuvenation and Enhancement of Concrete: Proceedings of the International Seminar held at the University of Dundee, Scotland, UK on 5–6 September 2002
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
