Article navigation
Purpose

– The purpose of this paper is to investigate a control strategy to fulfill low-voltage ride through (LVRT) requirements in wind energy conversion system (WECS).

Design/methodology/approach

– This paper considers an active front-end converter of a grid connected WECS working under grid fault conditions. Two strategies based on symmetrical components are studied and proposed: the first one considers control only for positive sequence control (PSC); the second one considered a dual controller for positive and negative sequence controller (PNSC). The performance of each strategy is studied on LVRT requirements fulfillment.

Findings

– This paper shows presents a control strategy based on symmetrical component to keep the operation of grid-connected WECS under unsymmetrical grid fault conditions.

Research limitations/implications

– This work is being applied to a 2 kVA laboratory prototype. The lab prototype emulates a grid connected WECS.

Originality/value

– This paper validate the PNSC strategy to LVRT requirements fulfillment by experimental results obtained for a 2 kVA laboratory prototype. PNSC strategy allows constant active power delivery through grid-voltage dips. In addition, the proposed strategy is able to grid-voltage support by injection of reactive power. Additional features are incorporated to PNSC: sequence separation method using delay signal cancellation and grid frequency identification using phase locked loop.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal