The findings from a set of related investigations into construction megaproject management were integrated into models, frameworks and basic guidelines that would help to improve and integrate (1) work packaging, (2) project participant selection and (3) operational management subsystems. More creative approaches to work packaging and participant selection were seen to significantly support construction industry development and the consequent longer‐term benefits in developing countries. A paradigm of ‘technology exchange’ is proposed as the basis of more viable and mutually beneficial joint ventures which would also facilitate the innovative packaging and integrated management of megaprojects in developing countries. Additionally, it is recommended that hitherto isolated initiatives related to quality, safety or dispute resolution/avoidance should be integrated into synergistic management systems which also incorporate built‐in monitoring and evaluation sub‐systems. In turn, the latter would trigger both short‐ and long‐term remedial measures related to improved project packaging, for example, as well as to personnel training and organizational development programmes.
Article navigation
1 March 1998
Review Article|
March 01 1998
Industry development through creative project packaging and integrated management
MOHAN M KUMARASWAMY
MOHAN M KUMARASWAMY
Department of Civil Engineering, The University of Hong Kong, Pokfulam Road, Hong Kong
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1365-232X
Print ISSN: 0969-9988
© MCB UP Limited
1998
Engineering, Construction and Architectural Management (1998) 5 (3): 228–237.
Citation
KUMARASWAMY MM (1998), "Industry development through creative project packaging and integrated management". Engineering, Construction and Architectural Management, Vol. 5 No. 3 pp. 228–237, doi: https://doi.org/10.1108/eb021077
Download citation file:
New and popular articles
Suggested Reading
Applicability of electronic document management system (EDMS) for the cost management of mega construction projects in Sri Lanka
Journal of Financial Management of Property and Construction (December,2023)
Increasing ‘local content’ in infrastructure procurement. Part 2
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (May,2010)
Increasing ‘local content’ in infrastructure procurement. Part 1
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (May,2010)
Supply chain structures in construction: views from Malawi
Proceedings of the Institution of Civil Engineers - Municipal Engineer (February,2015)
Strategies to address skills shortages in South African civil engineering
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (May,2012)
Related Chapters
Power Dynamics in Construction Project Procurement: Cultural and Societal Implications in Sub-Saharan Africa
The Emerald Handbook of African Studies
The Project Manager's Perspective
Early Contractor Involvement: Improving the Management of Contract Risk
Early Contractor Involvement Models: Their Pros and Cons and When to Use Them
Early Contractor Involvement: Improving the Management of Contract Risk
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.