Target cost contracts are growing in popularity but concerns remain about the interplay between fee, target, sharing ratios and the final price. This paper offers a fundamental analysis of the principles under‐pinning target contracts. It shows that there is scope for manipulation of tenders and that suboptimal methods of tender evaluation are in use. The paper analyses both fixed fee and percentage fee contracts. Methods of tender evaluation are proposed that will both reduce the scope for manipulation by tenderers and increase the likelihood of the contract being awarded to the tenderer whose final price will be the lowest. The analysis reveals a strong case for setting the contractor's share of cost overrun or underrun at a value that is not less than 50%. Finally, the paper proposes two simplifications that would reduce the number of variables in target cost contracts of the future. One is for the employer to set the fee and the other requires only that a target be tendered but with the fee built into it.
Article navigation
1 February 2000
Review Article|
February 01 2000
Target cost contracts: an analysis of the interplay between fee, target, share and price Available to Purchase
JOHN G. PERRY;
JOHN G. PERRY
School of Civil Engineering, The University of Birmingham, Edgbaston, Birmingham B15 2TT, UK
Search for other works by this author on:
MARTIN BARNES
MARTIN BARNES
School of Civil Engineering, The University of Birmingham, Edgbaston, Birmingham B15 2TT, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1365-232X
Print ISSN: 0969-9988
© MCB UP Limited
2000
Engineering, Construction and Architectural Management (2000) 7 (2): 202–208.
Citation
PERRY JG, BARNES M (2000), "Target cost contracts: an analysis of the interplay between fee, target, share and price". Engineering, Construction and Architectural Management, Vol. 7 No. 2 pp. 202–208, doi: https://doi.org/10.1108/eb021145
Download citation file:
Suggested Reading
Choosing the most economically advantageous tender using a multi-criteria decision analysis approach
Journal of Public Procurement (March,2022)
Balancing fee and quality in two envelope fee bidding
Engineering, Construction and Architectural Management (June,2004)
Crisp and fuzzy appraisal of tenderer’s qualifications in public works procurement in Turkey
Journal of Public Procurement (January,2023)
Muddled, massaging, manœuvring or manipulated?: A typology of organisational gaming
International Journal of Productivity and Performance Management (April,2008)
Foucault on targets
J Health Organ Manag (April,2004)
Related Chapters
THE USE OF WHOLE LIFE COST ANALYSIS IN TENDER EVALUATION OF CONCRETE BRIDGES
Innovations and Developments In Concrete Materials And Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 9–11 September 2002
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.