With an increasingly competitive global market, the UK construction industry finally realised that in order to survive, a marked increase in efficiency and effectiveness have to be achieved in all areas. This paper will describe the UK's approach to planning and designing the concrete operations that form a major part of many civil engineering construction projects. A productivity study has been carried out on three different construction projects and over 200 concrete pours have been observed. The data and knowledge collected on site have been subjected to lean construction philosophies, producing a “lean” measure of productivity, and it has been shown that major productivity increases could be achieved by implementing several relatively simple principles.
Article navigation
1 February 2004
Research Article|
February 01 2004
Planning, estimation and productivity in the lean concrete pour
Paul Dunlop;
Paul Dunlop
Postgraduate Student in School of Engineering and Electronics, The University of Edinburgh, Edinburgh, UK
Search for other works by this author on:
Simon D. Smith
Simon D. Smith
Lecturer in Project Management, Institute for Infrastructure and Environment, The University of Edinburgh, Edinburgh, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1365-232X
Print ISSN: 0969-9988
© Emerald Group Publishing Limited
2004
Engineering, Construction and Architectural Management (2004) 11 (1): 55–64.
Citation
Dunlop P, Smith SD (2004), "Planning, estimation and productivity in the lean concrete pour". Engineering, Construction and Architectural Management, Vol. 11 No. 1 pp. 55–64, doi: https://doi.org/10.1108/09699980410512665
Download citation file:
New and popular articles
Suggested Reading
Buildability factors influencing formwork labour productivity of isolated foundations
Journal of Engineering, Design and Technology (October,2010)
Integrated lean TQM model for global sustainability and competitiveness
The TQM Journal (March,2010)
Service supply chain management: A survey of lean application in the municipal sector
International Journal of Physical Distribution & Logistics Management (April,2011)
Application of constrained management and lean manufacturing in developing best practices for productivity improvement in an auto‐assembly plant
International Journal of Productivity and Performance Management (April,2006)
Application of hoshin kanri for productivity improvement in a semiconductor manufacturing company
Journal of Manufacturing Technology Management (July,2007)
Related Chapters
The Bottom-Up Market Sizing Tool
Performance-Based Strategy: Tools and Techniques for Successful Decisions
Panel Vector Autoregressive Models: A Survey The views expressed in this article are those of the authors and do not necessarily reflect those of the ECB or the Eurosystem.
VAR Models in Macroeconomics – New Developments and Applications: Essays in Honor of Christopher A. Sims
Engineering Medicine: The Deployment of Lean Production in Healthcare
Emerging Conceptions of Work, Management and the Labor Market
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.