Downtime (DT) caused by non‐availability of equipment and equipment breakdown has non‐trivial impact on the performance of construction projects. Earlier research has often addressed this fact, but it has rarely explained the causes and consequences of DT – especially in the context of developing countries. This paper presents a DT model to address this issue. Using this model, the generic factors and processes related to DT are identified, and the impact of DT is quantified. By applying the model framework to nine road projects in Nepal, the impact of DT is explored in terms of its duration and cost. The research findings highlight how various factors and processes interact with each other to create DT, and mitigate or exacerbate its impact on project performance. It is suggested that construction companies need to adopt proactive equipment management and maintenance programs to minimize the impact of DT.
Article navigation
1 June 2004
Research Article|
June 01 2004
Downtime model development for construction equipment management
Madhav Prasad Nepal;
Madhav Prasad Nepal
Research Scholar, Department of Building, School of Design and Environment, National University of Singapore, Singapore
Search for other works by this author on:
Moonseo Park
Moonseo Park
Assistant Professor, Department of Building, School of Design and Environment, National University of Singapore, Singapore
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1365-232X
Print ISSN: 0969-9988
© Emerald Group Publishing Limited
2004
Engineering, Construction and Architectural Management (2004) 11 (3): 199–210.
Citation
Prasad Nepal M, Park M (2004), "Downtime model development for construction equipment management". Engineering, Construction and Architectural Management, Vol. 11 No. 3 pp. 199–210, doi: https://doi.org/10.1108/09699980410535804
Download citation file:
New and popular articles
Suggested Reading
Factors influencing the construction time of civil engineering projects in Malaysia
Engineering, Construction and Architectural Management (September,2006)
Bidding ratios to predict highway project costs
Engineering, Construction and Architectural Management (February,2005)
Information technologies for business continuity: an implementation framework
Information Management & Computer Security (October,2006)
Tracking hidden quality costs in a manufacturing company: an action research
International Journal of Quality & Reliability Management (April,2011)
A construction quality costs quantifying system for the building industry
International Journal of Quality & Reliability Management (May,1998)
Related Chapters
MAJOR ROAD AND BRIDGE PROJECTS WITH FOAM CONCRETE
Use of Foamed Concrete in Construction: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 5 July 2005
We Can Fix it – Corruption in the Construction Industry
The Handbook of Business and Corruption: Cross-Sectoral Experiences
Night Patrols: Mobilising Collective Efficacy in Indigenous Communities
Crossroads of Rural Crime: Representations and Realities of Transgression in the Australian Countryside
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.