Skip to Main Content
Article navigation

A scheduling method for determining the critical path in linear projects is presented, that takes into account maximum time and distance constraints in addition to the commonly used minimum time and distance constraints. The maximum constraints, though often present in the specifications of a project, are not considered during the planning procedure, since no method existed to enable scheduling with them. The proposed method builds on the concept of the maximum constraints and expands on the necessary background for their implementation into the schedule. The introduced critical path algorithm allows for grouping linear activities into four categories regarding their critical status and their ability to influence project duration. The method is applied to a low‐pressure pipeline construction project and the results are presented.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal